← Back to search

Images from Archaeological Building Recording Work at Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear, January 2023

data.gov.uk (National Data Library) https://archaeologydataservice.ac.uk/advice/termsOfUseAnd... ? couldn't verify — publisher blocked our check Marine Environmental Data & Information Network · updated 2024-12-01
Open at publisher ↗
This collection comprises images from an examination and photographic survey of the Hendon Foreshore Barrier, Port of Sunderland, Tyne and Wear. This work was undertaken by Archaeological Services Durham University in January 2023. The damaged Hendon Foreshore Barrier was created as part of the original construction of the adjoining Hendon Dock, between 1864 and 1868. The structure of the sea wall is a braced timber frame with wooden facing filled with other materials. The original structure has been repaired on many occasions but much of what stands today is original fabric. According to the proposal drawings the old timber, stone and concrete sea wall will remain in place under a new and stronger concrete casing.

Files & links (2)

ResourceFormatVerifiedSize
ADS Digital Archive?? couldn't verify — publisher blocked our check
ADS website?unchecked

More from Marine Environmental Data & Information Network

Contains public sector information licensed under the Open Government Licence v3.0 and other licences as stated per dataset. Metadata collated by the UK Open Data Index.